Ernst Concrete Algonquin Facility Upgrades
In this project, we installed new lighting in most of the plant, all low voltage, sensors on conveyor belts, and powered them as well.

All lighting in this photo was installed by IHG Consulting. We also put up the Exit signs.
We installed all sensors and lighting on the drive-through truck wash as well as the lighting in the parking lot.

